Pre-Assembled Frames

With DiamondSteel the erection of our light gauge steel frames can be completed in just a few days….instead of taking weeks using other framing methods or materials.

The big difference in time (which reduces labour costs and means you can quickly move on to the next stages such as installing insulation and wall sheeting) is because we prefabricate the frames in our manufacturing facility.

The sections of frame arrive onsite as a flat pack…simply lift them into position and join them together. No fuss.